Uganda had two (2) Thermal Plants contributing electricity to the national grid; Jacobsen (U) Limited and Electromaxx (U) Limited, each with an installed capacity of 50 MW.

The Thermal Power Plants generated 207.3 GWh in 2018 as compared to 242.0 GWh in 2017. The drop in generation from the Thermal plants in 2018 as compared to 2017 was due to increase in energy generated from renewable energy sources (Hydro and Solar).