ERA - Electricity Regulatory Authority

Projects at Feasibility Study Stage

Email Download current view as PDF filePrint
  • id
  • Mt. Elgon Hydropower Company Limited
  • Muyembe-Sirimityo HPP
  • Sironko District.
  • Muyembe
  • 3.1
  • 2010/025
  • 2014-09-09