Sector Reports
Documents
Umeme’s Performance on Quality of Service Standards
Date added: | 11/06/2017 |
Filesize: | 678.2 kB |
Downloads: | 409 |
Umeme Limited Report on its performance in respect to compliance with the Quality of Service Standards for the 2nd, 3rd and 4th quarter of 2016.
Umeme’s Additional Investment Verification Report 2015
Date added: | 11/23/2017 |
Filesize: | 959.17 kB |
Downloads: | 442 |
Report of the Umeme Investment Verification 2015
Umeme’s Additional Investment Verification Report 2014
Date added: | 11/22/2017 |
Filesize: | 896.14 kB |
Downloads: | 193 |
Umeme’s Additional Retrospective Investment Verification Report 2014.
Umeme Limited 2012 Investment Verification Report
Date added: | 12/11/2013 |
Filesize: | 710.68 kB |
Downloads: | 4330 |
This report contains the results of the investment monitoring exercise for Umeme Ltd for the year 2012. The object of this exercise was to verify the size of the investment undertaken and actually deployed for the benefit of electricity consumers by December 31, 2012
Umeme Distribution Loss Study
Date added: | 10/25/2013 |
Filesize: | 673.8 kB |
Downloads: | 7785 |
This report presents the study of Umeme’s loss reduction efforts was undertaken in order to: establish the level of technical losses, and identify the required investments to
reduce the technical losses to optimal levels for such a network; establish the level of non-technical losses and identify measures to eliminate them. Establish the required inputs to achieve the desired levels of commercial losses; propose a loss reduction as well as the collection rates path or trajectory over the eight years that can be followed to reach a target on losses that is consistent with the current National Development Plan and a Target on non-collection rates that is consistent with an effectively run utility.
Umeme 2014 Investment Verification Report
Date added: | 11/29/2017 |
Filesize: | 848.51 kB |
Downloads: | 421 |
Performance Report of the Authority for Period 2010 - 2015
Date added: | 04/17/2015 |
Filesize: | 5.51 MB |
Downloads: | 3446 |
Grid Analysis for Integration of Wind/Solar Generation Plants
Date added: | 10/03/2016 |
Filesize: | 1.07 MB |
Downloads: | 1167 |
GET FiT Uganda: Annual Report 2015
Date added: | 02/25/2016 |
Filesize: | 7.87 MB |
Downloads: | 2636 |
Electricity Sector Performance Report July - December 2011
Date added: | 10/25/2013 |
Filesize: | 1.03 MB |
Downloads: | 2928 |
This publication presents the performance of the Electricity Supply Industry (ESI) for the period July 2011 to December 2011.
Electrcity Sector Performance Report July 2008 - June 2009
Date added: | 10/25/2013 |
Filesize: | 586.77 kB |
Downloads: | 2727 |
The report analyses the performance of the Electricity Supply Industry for the period July 2008 to June 2009.
DISCOs Performance on Quality of Service Standards
Date added: | 11/06/2017 |
Filesize: | 1.97 MB |
Downloads: | 350 |
Development and Investment Opportunities in Renewable Energy Resources in Uganda
Date added: | 10/25/2013 |
Filesize: | 1.21 MB |
Downloads: | 2178 |
This report highlights Uganda’s unexploited renewable energy resources. These resources include Biomass, Geothermal, large scale hydro, mini/micro/pico hydro, wind, peat and solar energy
Development & Investment Opportunities in Renewable Energy Resourses In Uganda - Feb 2014
Date added: | 02/26/2014 |
Filesize: | 2.82 MB |
Downloads: | 8604 |
This report highlights the Development and Investment Opportunities in Renewable Energy Resources In Uganda
Determinants of Fuel Supply Costs in Uganda
Date added: | 10/25/2013 |
Filesize: | 6.42 MB |
Downloads: | 4020 |
This reports presents a study that was initiated and conducted in collaboration with the Ministry of Energy and Minerals Development to establish appropriate benchmark data for fuel costs and to provide an understanding on fuel cost loqistics In Uganda, upon which reviewing the reasonableness of fuel costs proposed by thermal generators could be based
Constraints To Investment In Uganda’s Electricity Generation Industry
Date added: | 10/25/2013 |
Filesize: | 2.62 MB |
Downloads: | 4107 |
This report presents the results of a study carried out be ERA together with the Ministry of Finance, Planning and Economic Development to establish the constraints faced by investors into electricity generation
Carbon credits: a mechanism for global reduction of green house gas emissions
Date added: | 02/23/2014 |
Filesize: | 2.35 MB |
Downloads: | 3759 |
Accelerating Rural Electrification in Uganda through Energy Cooperatives
Date added: | 10/25/2013 |
Filesize: | 308.1 kB |
Downloads: | 2167 |
A presentation made at the Rural Electrification Forum in Maputo Mozambique, 15th -17th November 2011